REPAIR OF EPDM ROOF SYSTEM DECK

Hanscom Air Force Base | Boston, MA

GM HILL repaired the roof system deck at XXXXX. Prior to roofing activities GM HILL performed structural design services including analysis oof the spalled concrete roof deck and developed design for repair (to include analysis of underlying structural steel system); analyze building structure and design new roof access openings through existing exterior walls, and design stairways for new roof accesses on multiple levels. XXX site activities consisted of removal and reinstallation of all existing utilities, light fixtures, alarm bells, and antennas. GM Hill overcame two milestone challenges to successfully complete XXX asbestos and utility outages. With the use of available resources, the unidentified challenges were incorporated and the integrity of the design-build timeline was not affected. The project was delivered two months ahead of schedule.

ROOF REPAIR
REGLAZING AND WATERPROOFING